Page 132 - AIT1017_E-Paper
P. 132

BÜRO UND VERWALTUNG  •  OFFICE BUILDINGS  INNERE WERTE  • INNER VALUES

                                                                             T  he detached villa with a plastered base and brick walls is from 1910. Several conver-
                                                                                sions had taken place since then. Most recently, there were five flats in the building.
                                                                             In  addition,  a  dental  technician  laboratory  was  on  the  ground  floor.  When  Ute  und
                                                                             Wolfgang Mezger took over the house, a spacious commercial unit – consisting of offices
                                                                             on the ground floor and a model-making workshop on the lower level – was to result as
                                                                             the new location of the Wolfgang C.R. Mezger design studio. A small self-contained flat was
                                                                             also added on the lower level. For the upper- and the top-floor, two spacious flats were
                                                                             planned, which each take up the whole floor areas. The new uses made major changes
                                                                             in the layout necessary on all the levels. Most extensive were the interventions in the
                                                                             weight-bearing wall structures of the lower level. Here walls had to be moved, new ope-
                                                                             nings for doors made and window openings had to be enlarged. The roof supporting struc-
                                                                             ture was also changed, for instance for dismantling supports on the top floor and for
                                                                             installing new skylights. In addition, the roof was newly insulated and tiled. All the walls,
                                                                             ceilings and floors of the building were thoroughly overhauled. All the windows were fur-
                                                                             thermore renovated andreplaced. For all the changes, the greatest value was attached
                                                                             down to the last detail to careful workmanship as required for listed buildings.

                                                                             Prestigious design studio in a listed structure
               Eine neue Treppe erschließt die Werkstatt im Untergeschoss. • New stairs access the workshop on the lower level.
                                                                             The new workshop on the lower level is divided into two zones. In the building’s depth
                                                                             are the noisy machines necessary for making models – such as saws and milling machi-
                                                                             nes, while the manual model-making section extends along the façade. A glass wall
                                                                             acoustically separates the two sections yet links them visually. To direct sufficient light
                                                                             into the workshop level, the existing window openings were enlarged. This resulted in
                                                                             an attractive and bright workshop which offers an appealing working atmosphere and
                                                                             plenty of light. Thanks to its good illumination, the work area in the semi-circular bay
                                                                             is particularly suited for filigree manual work. For this purpose, the existing, large steel
                                                                             window with curved glass was replaced. Beside its own entrance at ground level, the
               Selbst kleinste Details wurden denkmalgerecht behandelt. • Details were treated as required for listed buildings.
                                                                             workshop is accessed from the ground floor via a new staircase. For this, a generous
                                                                             opening in the ceiling first had to be made. It creates an open and appealing connection
                                                                             between the two levels.
                                                                             Symbiosis of historic structure and modern use


                                                                             The former layout was conserved to the greatest possible extent. However, a few partition
                                                                             walls were removed to make room for a larger shared kitchen and to create a spacious
                                                                             room for presentations. To improve the lighting condition, additional window openings
                                                                             were added in both rooms. They were shaped like the existing windows next to them –
                                                                             including the elaborate stone surrounds in the external façade. To achieve this, an already
                                                                             retired builder specialized in shells was commissioned who still mastered the historic con-
                                                                             crete-charring technique from the time when the house was built and was able to repro-
                                                                             duce the stone jamb posts true to the originals. The wall from the corridor to the fireplace
                                                                             room was also torn down to here produce a spacious hall linked with the entrance area.
                                                                             The historic open staircase, on the other hand, had to be enclosed for reasons of fire pro-
                                                                             tection. The separation was designed in the form of a wooden construction matching the
                                                                             wall panelling of the room. All the room’s other historic installations such as dividing walls
                                                                             and various built-in cupboards were preserved and merely renovated.
               Die Villa strahlt wie zu ihrer Entstehung im Jahr 1910. • The villa shines like when it was built in 1910.  Grundriss Erdgeschoss • Ground floor plan



                                                                                     3

                                                                                                           5

                                                                                       2
                                                                                                 4       7     8
                                                                                   1

                                                                                                           6
                                                                                       6          6
                                                                                                                      1 Windfang • Porch
                                                                                                       6              2 Vorbereich • Vestibule
                                                                                                                      3 Büroküche • Office kitchen
                                                                                                                      4 Kaminzimmer • Fireplace room
                                                                                                                      5 Präsentationen • Presentations
                                                                                                                      6 Büroräume • Offices
                                                                                                                      7 Lager • Storage
                                                                                                                      8 Loggia/Drucker • Loggia/Printer


               132  •  AIT 10.2017
   127   128   129   130   131   132   133   134   135   136   137