Page 117 - AIT0525_E-Paper
P. 117

Entwurf • Design LRO Architekten, Stuttgart
                                                                          Bauherr • Client Stadt Ostfildern
                                                                          Standort • Location Gerhard-Koch-Straße 6, Ostfildern
                                                                          Nutzfläche • Floor space 6200 m 2
                                                                          Fotos • Photos Roland Halbe, Stuttgart
                                                                          Mehr Infos auf Seite • More infos on page 126

















             Markante Fassadenansicht der Architekturikone im Schulhausbau • Striking façade view of the architectural icon










                                                                                                             Grundriss untere Ebene • Floor plan lower level















             Fenster optimal für Belüftung und Tageslicht dimensioniert • Windows optimally for ventilation and daylighting  Grundriss mittlere Ebene • Floor plan middle level




             tors combined with an automatic fire alarm system ensures early warning for users and
             emergency services. One of the building’s strengths is its robustness and tectonic clarity:
             exposed masonry and rough board-formed concrete inside and out, with very few drywall
             installations or plastered walls.

             Unobtrusively solved

             However, this complicates any retrofitting of now safety-relevant elements requiring custom
             solutions for the wiring of smoke detectors, emergency lighting, escape route signage, the   Grundriss obere Ebene • Floor plan upper level
             control system for the hold-open devices, and the emergency response system. The clever-
             ly concealed cable routing above the built-in cabinets in the classrooms greatly facilitated
             the installation of main routes for power and digital media. A new layer of suspended cei-
             lings in sections of the corridors now houses emergency lighting and smoke detectors and
             also improves acoustics. Among the many adjusted details are, for example, the sanitary
             facilities adapted to the height of elementary school pupils. Parapets and railings also had   Längsschnitt • Longitudinal section
             to be slightly raised. More significant structural interventions resulted from the updated
             room schedule: former workshop spaces were repurposed for music and art, administra-
             tion areas and the teachers’ lounge were enlarged, new small group rooms were created,
             and a movement room was added. Traces of these changes are as little visible as the PV
             system on the roof (150 kW p), the retrofitted fall protection system, the updated lightning
             protection, or the conversion to LEDs. Still to come: removal of all temporary solutions and
             adapting the schoolyard to the needs of elementary school children.  Querschnitt • Transversal section

                                                                                                                           AIT 5.2025  •  117
   112   113   114   115   116   117   118   119   120   121   122