Page 111 - AIT1017_E-Paper
P. 111

Entwurf • Design AllesWirdGut Architektur, AT-Wien
                                                                                        Bauherr • Client Doppelmayr Immobilien, AT-Wolfurt
                                                                                        Standort • Location K.-Doppelmayr-Straße 1, AT-Wolfurt
                                                                                        Nutzfläche • Floor space 27.000 m 2
                                                                                        Fotos • Photos Hertha Hurnaus, AT-Wien
                                                                                        Mehr Information • More information on page 146

















                                                                                        HEADQUARTER DOPPEL-

                                                                                        MAYR IN WOLFURT




                                                                                        T  he first tow lift in Austria, which was installed in 1937, was not only
                                                                                           an outstanding achievement for winter sports in Zürs am Arlberg
                                                                                        but the construction project was a real turning point in the company his-
                                                                                        tory of the manufacturer of the lift as well. After 45 years, Doppelmayr,
                                                                                        the medium-sized producer of work machines in Wolfurt, changed its
                                                                                        field of activity and, in the following decades, developed into a world
                                                                                        market leader in the construction of ropeways. Today, the company has
                                                                                        a foothold in 35 countries and has already built more than 14,800 rope-
                                                                                        way  systems  in  91  countries.  Despite  all  this  success,  Doppelmayr
                                                                                        remained  faithful  to  the  community  of Wolfurt  as  the  location  of  its
                Grundriss Erdgeschoss • Ground floor plan                               headquarters. The only problem was that the old building no longer met
                                                                                        the requirements of the 21st century. Remedial action was taken by the
                                                                                        planners from AllesWirdGut Architektur since they designed at the edge
                                                                                        of the Alps a prestigious office complex which looks like an urban, visu-
                                                                                        ally almost floating ensemble of buildings with a linear design vocabu-
                                                                                        lary. Already from the outside, the basic concept becomes apparent: The
                                                                                        strict emphasis on the horizontal and the division of the compact struc-
                                                                                        ture into nine differently dimensioned volumes. The so-called houses
                                                                                        serve to structure the overall 27,000 square metres of the complex and
                                                                                        are linked by a centrally located access system. Thanks to various views
                                                                                        and atriums, the architects here succeeded in designing a light-flooded
                                                                                        circulation area with a high quality of stay to which all the side rooms
                                                                                        as well as the break areas and loggias, which can be used by all the
                                                                                        departments, adjoin. The very self-contained hallway system links all
                Grundriss 1. Obergeschoss • Floor plan Level +1                         five storeys and thus becomes the supporting element for the continu-
                                                                                        ous exchange among the employees and the general orientation in the
                                                                                        building.  Work  is  done  along  the  façade  with  a  panoramic  view  of
                                                                                        Wolfurt and the mountain range of the Alps. The interior design subor-
                                                                                        dinates to the impressive scenic backdrop and concentrates on what is
                                                                                        essential with contrasts of light and dark and a minimalist choice of
                                                                                        colours and materials. In this way, spatial cubatures and details such as
                                                                                        the pattern of joints on the walls and ceilings or the flush-integrated light
                                                                                        strips have an increased visual impact. For maximum flexibility on all
                                                                                        the office floors, the complete building technology was hidden in cavity
                                                                                        floors while the temperature is regulated with heating-cooling ceilings
                                                                                        and allows overall problem-less configuration of the areas regarding the
                                                                                        use of the sections and the room capacities. High-quality, strong, precise
                                                                                        and farsighted: With the construction of the new headquarters, the archi-
                                                                                        tects make the company’s basic values manifest and create an adapt-
                                                                                        able work setting which communicates a highly serious, focussed and
                Schnitt • Section                                                       self-confident appeal towards the inside and the outside.


                                                                                                                               AIT 10.2017  •  111