Page 135 - AIT0419_E-Paper
P. 135

Entwurf • Design Waterfrom Design, TW-Taipeh
                                                                                        Bauherr • Client Forest Spring Enterprise
                                                                                        Standort • Location TW-Chiayi
                                                                                        Nutzfläche • Floor space 900 m 2
                                                                                        Fotos • Photos Kuomin Lee, TW-Taipeh
                                                                                        Mehr Infos auf Seite • More infos on page 166












                                                                                        FILTER LIFE

                                                                                        IN CHIAYI





                  1  Zugang Gelände • Access to the site                                The modernisation of the company premises of Forest
                 2  Basketballplatz • Basketball court
                 3  Parkplatz • Car park                                4               Spring Enterprise, a Taiwanese water filter producer,
                 4  Bürogebäude • Office building                                       was an important step towards the future when it was
                 5  Fabrikgebäude • Factory building                                    handed over to the second generation. The design by
                 6  Rezeption/Empfang • Reception
                 7  Showroom • Showroom                                                 interior architect Nic Lee today uses highlights in bright
                 8  Besprechungsraum • Meeting room                                     colours, flowing materials, and open room sequences
                 9  Arbeitsplätze • Workplaces              5             3      2
                 10  Aufenthaltsraum • Staffroom                                        to mark the progressive departure into a new era.
                 11  Lager • Storeroom
                 12  Empfang • Reception
                                                                                        F  or family-run companies, the generation change usually pre-

                                                                          1                sents a great personal and organisational challenge. While the
                                                                                        old generation has to hand over the reins, the generation taking over
                                                                                        has to prove its skills on its own. In Chiayi, a city in the South of Tai-
                                             Geländeplan • Site plan                    wan, this change seems to have been successfully accomplished. At
                                                                                        least that's what the completely renovated office and factory buil-
                                                                                        dings of Forest Spring Enterprise, a manufacturer of water filters for
                                                                                        technical equipment, such as fully automatic coffee machines, sug-
                                                                                        gests. The interior designers and architects from Waterfrom Design
                                                                              8
                                                                                        have restructured the 30-year-old company premises and have given
                                                                                        the L-shaped office wing adjacent to the production hall a fresh,
                                                9
                                                                                        contemporary appearance. In front of the forecourt, the previously
                                                                                        closed façade was replaced by translucent panels that allow glare-
                         10                                    6              7
                                                                                        free daylight to enter the building. In keeping with the industrial sur-
                                                                                        roundings, the designers left the supporting structure of the two-sto-
                                                                                        rey hall as well as the ventilation and installation pipes visible. A
                                                                                        gallery level now zones the room’s vertical expanse and provides se-
                                                                                        parated offices, which are enclosed by glass walls. The choice of the
                                                                                        newly introduced materials and their multi-layered use are all cha-
                                                                                        racterised by the theme of water and its path through the complex
                Grundriss Erdgeschoss • Ground floor plan                               structure of a filter system. Both employees and visitors are welco-
                                                                                        med at a concrete counter that shows traces of water. The glass rear
                                                                                        wall was treated by hand with carbon and reproduces wave-like
                                                                                        movements. Behind it, the various functions of meeting, showroom,
                                     9            9       9                     12
                                                                                        workplaces, and lounge are lined up in a flowing sequence of
                                                                                        rooms. Filigree walls, which are alternatively designed as a grid
                                                                                        structure or made of printed glass, zone the floor plan and simulta-
                                                                                        neously provide visual references in all directions. The working en-
                                                                        11       9      vironment, which is finished in elegant shades of grey, is loosened
                                                                                        up by colour highlights: cheerful canary yellow used to paint the rai-
                                                                                        ling of the gallery and bright red selected for the workplace luminai-
                Grundriss Obergeschoss • Upper floor plan                               res underline the young, modern appearance of the next generation.


                                                                                                                              AIT 4.2019  •  135
   130   131   132   133   134   135   136   137   138   139   140