Entwurf • Design Buchner Bründler Architekten, CH-Basel
Bauherr • Client Urner Kantonalbank, CH-Altdorf
Standort • Location Bahnhofplatz 1, CH-Altdorf
Nutzfläche • Floor space 10.160 m 2
Fotos • Photos Rory Gardiner, GB-London
Mehr Infos auf Seite • More infos on page 166
Der Neubau als Teil des Knotenpunkts am Bahnhof Altdorf • The new building at transport hub Altdorf station
In den großen Fenstern spiegelt sich das umliegende Gebirge. • The mountains are reflected in the large windows. Lageplan • Site view
This support concept made a shoring of the construction necessary during the building
period until the its frictional connection with the supporting components in the section
of the roof. In order to avoid unwanted sound transmissions caused by the railway traf-
fic, the underground building parts have been separated from the building site with an
acoustic mat. The entire building load rests flat in the stable gravel of the Altdorf village
brook. We planned the room-high bands of windows as pre-fabricated elements. On
the east side of the building, the façade is equipped with ventilation flaps as parallel Grundriss Erdgeschoss • Ground floor plan
quarterlights and, on the side towards the railway, fixed-glazed because of possible
disturbances. Textile marquees ensure exterior protection from the sun. Our concept
for the building technology is based on the sustainability guidelines of the Minergie re-
quirements. The heat demand is completely met with a reversible heat pump-cooling Bildunterschrift • englisch
machine with a technical accumulation that generates energy from the groundwater.
In addition, the photovoltaic system on the roof produces a significant share of the ne-
cessary electricity in situ. The building is supplied with electric energy via medium vol- Grundriss 2. Obergeschoss • Floor plan level +2
tage of the transformer station. The individual floors are accessed through continuous
rider zones starting at the respective main distributors located on the lower level.
These lead into sub-distributors which make the generation of flexible functional units
for the individual rentals. The individual installations of building technology are con-
trolled and regulated in their complete functionality with a sophisticated superordinate
web-enabled building-automation overall system. Alarms are recorded and selected
and relayed according to priority. For the lighting, we installed glare-free LED luminai-
res with optimum light control to avoid disturbing light reflections at the work stations. Längsschnitt • Longitudinal section
AIT 10.2022 • 155