Page 155 - AIT1022_E-Paper
P. 155

Entwurf • Design Buchner Bründler Architekten, CH-Basel
                                                                           Bauherr • Client Urner Kantonalbank, CH-Altdorf
                                                                           Standort • Location Bahnhofplatz 1, CH-Altdorf
                                                                           Nutzfläche • Floor space 10.160 m 2
                                                                           Fotos • Photos Rory Gardiner, GB-London
                                                                           Mehr Infos auf Seite • More infos on page 166















             Der Neubau als Teil des Knotenpunkts am Bahnhof Altdorf • The new building at transport hub Altdorf station




























             In den großen Fenstern spiegelt sich das umliegende Gebirge. • The mountains are reflected in the large windows.  Lageplan • Site view




             This support concept made a shoring of the construction necessary during the building
             period until the its frictional connection with the supporting components in the section
             of the roof. In order to avoid unwanted sound transmissions caused by the railway traf-
             fic, the underground building parts have been separated from the building site with an
             acoustic mat. The entire building load rests flat in the stable gravel of the Altdorf village
             brook. We planned the room-high bands of windows as pre-fabricated elements. On
             the east side of the building, the façade is equipped with ventilation flaps as parallel  Grundriss Erdgeschoss • Ground floor plan
             quarterlights and, on the side towards the railway, fixed-glazed because of possible
              disturbances. Textile marquees ensure exterior protection from the sun. Our concept
              for the building technology is based on the sustainability guidelines of the Minergie re-
              quirements. The heat demand is completely met with a reversible heat pump-cooling  Bildunterschrift • englisch
             machine with a technical accumulation that generates energy from the groundwater.
             In addition, the photovoltaic system on the roof produces a significant share of the ne-
             cessary electricity in situ. The building is supplied with electric energy via medium vol-  Grundriss 2. Obergeschoss • Floor plan level +2
             tage of the transformer station. The individual floors are accessed through continuous
             rider zones starting at the respective main distributors located on the lower level.
             These lead into sub-distributors which make the generation of flexible functional units
             for the individual rentals. The individual installations of building technology are con-
             trolled and regulated in their complete functionality with a sophisticated superordinate
             web-enabled building-automation overall system. Alarms are recorded and selected
             and relayed according to priority. For the lighting, we installed glare-free LED luminai-
             res with optimum light control to avoid disturbing light reflections at the work stations.  Längsschnitt • Longitudinal section

                                                                                                                           AIT 10.2022 • 155
   150   151   152   153   154   155   156   157   158   159   160